Question: The minimum project duration is ___. 35 48 63 91 After a re-evaluation of the duration of activity B, it has been provided the

The minimum project duration is ___. 35 48 63 91 After are-evaluation of the duration of activity B, it has been provided the

The minimum project duration is ___. 35 48 63 91 After a re-evaluation of the duration of activity B, it has been provided the following data. Most likely duration = 10 Optimistic Duration = 16 Pessimistic Duration = 25 Using the three-point estimating technique the new duration of activity B is __. 7 15 17 22 Including the new duration of activity B, the minimum project duration is ___. 48 63 65 91 Reference the following Precedence Diagram with its times to answer the next 4 questions. 10 12 Float:15 6 Float: 10 Float: 11 13 H Float: 0 Float: 0 Float: 0 15 17 B 212 39 L 39 Float: 0 Float: The Total Float of activity D is_. 0 10 12 22 22 The Total Float of activity F is _. 0 17 22 39 The Critical Path of the schedule is A, C, D, G, I A, F, H, I A, B, F, H, I A, B, F, G, I

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!