Question: The Mississippi DOT proposes to construct a 7 2 - inch outer diameter by 0 . 7 5 thick storm drain beneath I - 2

The Mississippi DOT proposes to construct a 72-inch outer diameter by
0.75 thick storm drain beneath I-20 near the Pearl River in Jackson. The pipeline will be steel
and the crossing will be approximately 300 feet long. The proposed construction method is
auger boring (jack and bore). The drawings indicate earth cover above the invert of the storm
drain pipe will vary from 15 to 20 feet. A geotechnical investigation was conducted for the
crossing. The logs of the 2 borings drilled on either side of I-20 are attached. The boring logs
indicate loose to medium dense silty sand. Groundwater was encountered at about 12 feet
below I-20 ground surface. Research settlement risk evaluation methods and the auger boring
method. Review provided geotechnical information. Answer the following:
1. Calculate the anticipated systematic settlements associated with closure of the
annular space between the bore and the steel storm drain pipeline. Assume that
the bore diameter is 74 inches, creating a radial overcut of 1.0 around the pipe.
Bracket your results using conservative but realistic assumptions and more realistic
less conservative assumptions regarding closure of the annulus. Assume that the
annulus is completely filled with bentonite lubricant for case 2 but no bentonite
lubricant is injected for case 1. List all assumptions and the calculation
model/approach used in your work.
2. Calculate the anticipated settlements associated with 1% and 2% face losses.
3. Combine the results of 1 and 2 to Estimate total settlements.
4. Are the estimated total settlements likely acceptable to MSDOT?
5. Is the auger boring method appropriate for the proposed crossing? If not what
would be a more appropriate method to use?
6. What would be the expected settlement if we could wish the storm drain pipeline
into place?
7. Bonus: If settlements exceed values to MS DOT, what mitigation measures could be
implemented to reduce them?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!