Question: The predetermined overhead rate is calculated by taking: multiple choice 2 Actual manufacturing overhead cost divided by estimated total cost driver Estimated manufacturing overhead cost
The predetermined overhead rate is calculated by taking:
multiple choice
Actual manufacturing overhead cost divided by estimated total cost driver
Estimated manufacturing overhead cost divided by estimated total cost driver
Estimated manufacturing overhead cost divided by actual total cost driver
Actual manufacturing overhead cost divided by actual total cost driver