Question: The process capability index ( C p / C pk ) Should be = 0 . 5 for a capable process the ratio of the

The process capability index (C p /C pk ) Should be =0.5 for a capable process the ratio of the range of values allowed divided by the range of values produced 00000 Defines the mean and standard deviation of the process Should be 1 for a capable process Is the mean divided by the square of the standard deviation (variance) the ratio of the range of values produced divided by the range of values allowed