Question: The production volume variance under the normal costing method is calculated as: the difference between actual production and budgeted production. the sum of budgeted fixed
The production volume variance under the normal costing method is calculated as:
|
| the difference between actual production and budgeted production. |
|
| the sum of budgeted fixed manufacturing overhead costs and allocated fixed manufacturing overhead costs. |
|
| the difference between budgeted fixed manufacturing overhead costs and actual fixed manufacturing overhead costs. |
|
| the difference between actual fixed manufacturing overhead costs and assigned fixed manufacturing overhead costs. |