Question: The RMR value = 4 3 Q - system = 0 . 8 9 5 1 . Given that the cost of waste material is

The RMR value=43 Q-system=0.895
1. Given that the cost of waste material is R30/m^3, ore material sells at R1000/ton. Determine the percentage gain in the open pit as a result of increasing overall slope angle by 1 degree.
2. If the preferred underground method is block caving, determine the suitable dimensions for rectangular undercuts for caving.
3. The only available space for top-soil and softs dump is 150m x 150m. Design duitable dump architecture in line with company policy.