Question: The site shown below is initially saturated ( water table at the ground surface ) . Dewatering will take place, and the water table will

The site shown below is initially saturated (water table at the ground surface). Dewatering will take place, and the water table will drop 4 meters, as shown below. Consolidation of the clay will ensue. A specimen was obtained from point A and taken to the lab for testing. The following parameters were obtained: OCR=1.5, compression index =0.34, recompression index =0.05, void ratio =0.8, pre-consolidation stress =130kPa, coefficient of consolidation =0.06m2? day. Determine the consolidation settlement of the clay layer 90 days after dewatering. Show your work and circle your answer.
The site shown below is initially saturated (

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock