Question: The student will select and installselect and install dry wall fire-rated systems to walls and ceilings. You must carefullyanalyse the information given in the 'plans

The student will select and installselect and install dry wall fire-rated systems to walls and ceilings. You must carefullyanalyse the information given in the 'plans and specifications' before initiating the work.

Thetrainerwillsupervise/observetheworkbystandingneartheworkinglocation.Thestudentwillbe

requiredtobringallnecessaryPPE'srequiredtocomplete

Toolandequipmentrequired

  • Broadknives

  • Caulkingguns

  • Hammers

  • Measuringtapesandrules

  • Powerdrills

  • Powerleads

  • Screwguns

  • Squares

  • Tinsnips

  • Trowels

  • Cclamps

  • Lockingsawsanddropsaws

  • Masonrydrills

  • Sawstools

  • Settingboxes

Materialsrequired:

  • Basecompoundcoats

  • Finishingcoats

  • Firegrademetalstudsandtrack

  • Firegradeplasterboardsheeting

  • Firesealants

  • Perforatedpapertapes

  • Vermiculiteorequivalentproduct.

Documentsrequired:

  • Australianstandards

  • Manufacturerspecifications,wherespecified

  • Workplaceoperationsandprocedures

  • Drawingsandspecifications

  • Environmentalmanagementplan

  • Sitesafetyplanandprocedures

Activity 8: Line timber joist ceiling using fire-rated system.

Thisactivityrequiresyoutolinetimberjoistceilingusingfire-ratedsystem.

.Checklist5:Linetimberjoistceilingusingfire-ratedsystem.

Steps

Tickmark,once completed

Step1:Checkceilingsubstrateandlinetomanufacturer'sfire-rating design.

Further,documenttheproceduresyouimplementedtocheckceiling substrate and line to manufacturer's fire-rating design using Template 5.

v

Step2:Selectfixingsandapplylining.

Further, document the procedures you implemented to select fixings and apply lining using Template 5.

v

Step3:Spacefixingsatcorrectintervals.

Further,documenttheproceduresyouimplementedtospacefixingsat correct intervals using Template 5.

v

Step4:Completepenetrations.

Further, document the procedures you implemented to complete penetrations using Template 5.

v

Step5:Finishjointstoexposedfacesheetlayersusingfire-ratedmaterials

andprocedurestomanufacturer'sfire-ratingdesign.

Further, document the procedures you implemented to finish joints to exposed face sheet layers using fire-rated materials and procedures to manufacturer's fire-rating design using Template 5.

v

pls complete template 5

Template5:Linetimberjoistceilingusingfire-ratedsystem.

Linetimberjoistceilingusingfire-ratedsystem.

Client Name: STC

Address: 16 Lotus St, Woolloongabba QLD 4102

Phone Number: 07)3891 3282

Date(dd/mm/yyyy)

Worker name: J

JobDetails:

Linetimberjoistceilingusingfire-ratedsystem Worker signature: J

Explanation

Procedures you implemented to check ceiling substrate and line to manufacturer's fire-rating design

Procedures you implemented toselect fixings and apply lining

Procedures you implemented tospace fixings at correct intervals

Procedures you implemented tocomplete penetrations

Procedures you implemented to finish joints to exposed face sheet layers using fire-rated materials and procedures to manufacturer's fire-rating design

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!