Question: The term Contract Documents typically includes: Question 14 options: 1) Contract Forms 2) Drawings 3) Specifications 4) All of the above Who is responsible for

The term "Contract Documents" typically includes:

Question 14 options:

1) Contract Forms

2) Drawings

3) Specifications

4) All of the above

Who is responsible for the technical sufficiency of the design and construction documents?

Question 16 options:

1)

The Owner

2)

The Contractor

3)

The design professional (A/E)

4)

The city inspector

Who is responsible for the technical sufficiency of the design and construction documents?

Question 16 options:

1)

The Owner

2)

The Contractor

3)

The design professional (A/E)

4)

The city inspector

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!