Question: The two laborers from Problem 1 will be transporting lumber from the stockpile to the work area, which is an average of 6 5 feet.

The two laborers from Problem 1 will be transporting lumber from the stockpile to the
work area, which is an average of 65 feet. STATE YOUR ASSUMPTIONS for a cycle
time based on the example from the text. The crew of 5 carpenters can build formwork
up to 6 above ground at a rate of 32 sf/hour (if the lumber is available). Based on a 45
min hour, determine the probable rate for building 2x6 formwork and production unit
cost for the concrete formwork in $/sf.