Question: The Work Breakdown Structure (WBS) is a technique of looking at the project at a high level and subsequently breaking the work down into smaller

The Work Breakdown Structure (WBS) is a technique of looking at the project at a high level and subsequently breaking the work down into smaller pieces until you can get the full picture of the work that needs to be performed. Choose a project that you are familiar with and describe the work that needs to be undertaken. Thereafter, design a WBS up to four (4) levels for the work identified.