Question: There is a 4 percent error rate at a specific point in a production process. If an inspector is placed at this point, all the

There is a 4 percent error rate at a specific point in a production process. If an inspector is placed at this point, all the defects can be detected and eliminated. The inspector would cost $9 per ho