Question: There is a batch plant located 150tt from where a water connection to an existing 6 city main will take place. the line running to

There is a batch plant located 150tt from where a water connection to an existing 6" city main will take place. the line running to the batch plant is a 10\" line. please calculated the expected flow GPM at the patch plant based off the info below and show all steps formulas... will rate! 3,500 GPM 180 psi static 154 psi residual diatance from hydrant to batch plant is 2.300ft elevation change of 150ft