Question: This is a multi part problem Required information Upriver Parts manufactures two products, V-1 and V-2 at its River Plant. Selected data for an average

 This is a multi part problem Required information Upriver Parts manufacturestwo products, V-1 and V-2 at its River Plant. Selected data foran average month for the two products follow. V-1 10,eee $ 21 80 V-2 1.ee $ 4 Units produced Direct materials cost per

This is a multi part problem

Required information Upriver Parts manufactures two products, V-1 and V-2 at its River Plant. Selected data for an average month for the two products follow. V-1 10,eee $ 2 1 80 V-2 1.ee $ 4 Units produced Direct materials cost per unit Machine hours per unit Production runs per month 48 Production at the plant is automated and any labor cost is included in overhead. Data on manufacturing overhead at the plant follow. Machine depreciation Setup labor Material handling Total $54,600 25,200 15,840 $95,040 Required: a. Upriver currently applies overhead on the basis of machine hours. What is the predetermined overhead rate for the month? (Round your answer to 2 decimal places.) b. Upriver is thinking of adopting an ABC system. They have tentatively chosen the following cost drivers: machine hours for machine depreciation, production runs for setup labor, and direct material dollars for material handling. Compute the cost driver rates for the proposed system at Upriver. (Round "Machine depreciation" answer to 2 decimal places.) a. $ b. Overhead rate Machine depreciation Setup labor Material handling 7.92 per machine hour per machine hour per production run % direct material cost Part 2 of 2 Required information Upriver Parts manufactures two products, V-1 and V-2. at its River Plant. Selected data for an average month for the two products follow. 1.53 points V-1 10,eee $ 2 1 80 V-2 1. eee $ 4 Units produced Direct materials cost per unit Machine hours per unit Production runs per month 48 eBook Production at the plant is automated and any labor cost is included in overhead. Data on manufacturing overhead at the plant follow. Machine depreciation Setup labor Material handling Total $54,600 25,280 15,848 $95,040 References Required: a. Compute the unit costs for the two products V-1 and V-2 using the current costing system at Upriver (using machine hours as the allocation basis). (Do not round Intermediate calculations. Round your answers to 2 decimal places.) b. Compute the unit costs for the two products V-1 and V-2 using the proposed ABC system at Upriver. (Do not round intermediate calculations. Round your answers to 2 decimal places.) Unit Cost V-1 V-2 Using current costing system Using proposed ABC system b

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!