Question: This problem has FIVE multiple choice questions. Choose the correct answer from each dropdown box. Rocky Top hardware specializes in manufacturing steel bars. The process





This problem has FIVE multiple choice questions. Choose the correct answer from each dropdown box. Rocky Top hardware specializes in manufacturing steel bars. The process starts with raw material (carbon sted wire), and then progresses sequentilly through five steps using machines A to E, respectively (see table below). This is the only use that the five machines are put to. The hourly throughput rates (in lbs/hour) for each machine are siven below. 1. What is the maximum system output of steel product per hour? 2. If machine B in Step 2 works at full capacity, what is the maximum number of steel bars waiting to be processed by machine C in 5 tep 3 at the end of an 8 .hour day (both mochine B and C work for 8 hours)? 3. Which of the following machines are bottienecks, if market demand is 85lbs/ hour? 4. If market demand is 85lbs/ hour, the following resource is the constraint: 5. By how much would the hourly system output be improved if the capacity of machine B was increased to 80 lbs/hour? 1. What is the maximum system output of steel product per hour? full capacity, what is the maximun 3 at the end of an 8-hour day (bc 2. If machine B in Step 2 works at f be processed by machine C in Step hours)? [Select]0lbs65lbs520lbs240lbs280lbs 3. Which of the following machines are be [ Select] A and B D and E A,B,C,D, and E B,D, and E hour, the fol 4. If market demand is 85lbs/ hour, the following resource is the constraint: [Select ] Machine A Machine B Machine C Machine D urly system output be improved if the capacity o Machine E 5. By how much would the hourly system output be improved if the capacity of machine B was increased to 80lbs/ hour? v [Select] 0lbs 10lbs 20lbs 35lbs 50lbs
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
