Question: This project includes new classrooms and training workshops. The contractor bid the project lump sum, and it is approximately 9 0 % completed. Dry wall

This project includes new classrooms and training workshops. The contractor bid the project lump sum, and it is approximately 90% completed. Dry wall is being taped, and finish materials are beginning to arrive on the job site. On a recent walk-through, the owner and architect (control agency, consultant to the owner) realized that several items are not exactly as they had anticipated. The gray carpet is actually black. The plywood wainscot in the warehouse area is CD grade, not AC. The sanitary waste pipe in the ceiling space between the two floors is plastic, not cast iron, and will be noisy and may not meet code requirements. The gates on the fence are swinging, not rolling. The interior wood trim is hemlock, not oak. There are many other examples of these types of surprises. The contract requirement for preparing submittals (samples of materials to be used) was generic, and although it did list some items to be submitted, it did not list everything. There were conflicts in the documents. The contractor has chosen the most inexpensive materials, wherever possible, and is now basing his argument on document inconsistency. The architect is recognizing that there were some inconsistencies but is pleading to the contractor that if there were questions, he was to ask, or a submittal could have been used to verify the design intentions. It is now too late to make changes, and the owner will have to accept these conditions.
How could each of the parties (owner, architect and contractor) improve their performance?
If there were a withholding of funds from the owner to the contractor, who would win the dispute? List the reasons.
Please write a contract for the case (The contract should reduce or eliminate the negative impact of the problems indicated above between owner and the contractor) in no more than 3 pages. Please yellow highlight your solutions in the contract. ( please answer all questions )
This project includes new classrooms and training

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!