Question: This section shall use EVM to compare the planned versus actual task (hours) and schedule (dates) metrics. Any significant deviation(s) from the planned values shall

This section shall use EVM to compare the planned versus actual task (hours) and schedule (dates) metrics. Any significant deviation(s) from the planned values shall be documented.

Client: Kilowatt Inc.

Stakeholders: Homeowners, Power Utilities companies, local politicians

Project: A distributed solar power system and associated infrastructure that can power 1000 homes

Objectives

  1. The system must be such that it can be installed in a residential dwelling.
  2. The system must be able to be networked with other installations to expand capacity.
  3. The system must be able to store energy when the sun is not optimum and at night.
  4. The system must operate in automatic and manual mode.
  5. The system must be able to sell excess power to local power utilities.

Software objectives

  1. The system must be able to monitor electrical production.
  2. The system must be able to monitor the condition of the main power production facility as well as the connected home of the system.
  3. The system must be able to store power production data and analyze the data for optimum operations.
  4. The system must be able to report operation to any local regulatory agencies.
  5. The system must be able to emergency conditions from any part of the system.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!