Question: Three different activity times are needed for probabilistic time estimation. Match the term with the definition. Optimistic time Optimistic time drop zone empty. Pessimistic time

Three different activity times are needed for probabilistic time estimation. Match the term with the definition. Optimistic time Optimistic time drop zone empty. Pessimistic time Pessimistic time drop zone empty. Most likely time Most likely time drop zone empty. The length of time required under optimum conditions. The length of time required under the worst conditions. The most probable amount of time required