Question: Three dump trucks are being planned to work as a team to excavate a particular site. Each dump truck can excavate 180m per day and


Three dump trucks are being planned to work as a team to excavate a particular site. Each dump truck can excavate 180m per day and is likely to be broken down to 2 days in 10. Calculate the probability of the fleet achieving a range of daily outputs, plot them on histogram, and calculate the average daily output of the fleet