Question: Three processes with the following arrival times and total CPU times are executing using MLF scheduling with 5 priority levels. Process Arrival time Total CPU

Three processes with the following arrival times and total CPU times are executing using MLF scheduling with 5 priority levels.
Process Arrival time Total CPU time
p1060
p2030
p32010
The quantum is Q =10 at level 5 and is doubled at each lower level.
The context switching time is S =0. p1 terminates at priority levelp3 terminates at priority level The turnaround time of p1 isThe turnaround time of p3 is