Question: Three prospective designs are under consideration for a manufacturing cell. The first uses 3 parallel machines each with service rate , a common queue, and
Three prospective designs are under consideration for a manufacturing cell. The first uses parallel machines each with service rate a common queue, and total arrival rate The second option uses the same machines but has a separate queue for each machine. Arriving part batches will be randomly assigned to a machine. The third configuration consists of one fast machine, which serves at the rate of Ignoring the capital and operating costs, which system has the lowest throughput time and WIP levels? You may assume interarrival and service times are exponential and let and
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
