Question: Three signal phases will be designed for a signalized intersection. The calculated optimum cycle length is 6 5 seconds. Assume that each phase loses 4

Three signal phases will be designed for a signalized intersection. The calculatedoptimum cyclelength is 65 seconds.Assume that each phase loses 4 seconds. What is the total effective green time for all the phases?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!