Question: Three work study analysts are rating an employee. Work study analyst 1 rates the employee at performance rating factor = 1.0 and an observed time

Three work study analysts are rating an employee. Work study analyst 1 rates the employee at performance rating factor = 1.0 and an observed time of 2.8 minutes per unit. Work study analyst 2 rates the employee at PRF = 1.1 and an OT of 3.1 minutes per unit. Work study analyst 3 rates the employee at PRF = 0.8 and an OT of 3.0 minutes per unit. What should the standard time be, assuming an allowance factor of 20%? a. 3.444 minutes per unit b. 3.339 minutes per unit c. 3.560 minutes per unit d. 3.667 minutes per unit