TIME-COST TRADEOFF METHODOLOGY
a) What is the total cost AND duration if all activities are performed in their normal time?
b) What is the shortest possible time to complete the project?
(KEY: USE PATH WTTH LONGEST CRASH TIME IN WEEKS)
c) Calculate the per-week crash cost for?
(3) Activity S?
d) What is the lowest possible cost to achieve the time given in answer b)?(Provide the new total cost and the cost and durations used for each activity to achieve this cost and schedule.)