The figure below shows a structural detail for footing in a building. The existing elevation of the ground is assumed to be mAMSL. The side slope of the ground is considered to be :H: V and the workspace is
gs
Estimate the quantities of steel required to construct this footing
Using Master format, write the cost code for reinforcement steel activity assuming the following: the building will be constructed in March and will be the third project for this contractor this year. The location of this building is Birzeit University. The code for this Area is