Question: Time left 0 : 3 5 : 4 0 The figure below shows a structural detail for footing 2 in a building. The existing elevation

Time left 0:35:40
The figure below shows a structural detail for footing 2 in a building. The existing elevation of the ground is assumed to be 750mAMSL. The side slope of the ground is considered to be 12:1(H: V), and the workspace is
gs.
2. Estimate the quantities of steel required to construct this footing
(7%)
3. Using Master format, write the cost code for reinforcement steel activity assuming the following: the building will be constructed in March 2018 and will be the third project for this contractor this year. The location of this building is Birzeit University. The code for this Area is 10
(5%)
Time left 0 : 3 5 : 4 0 The figure below shows a

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!