Question: To test whether the mean time to mix a batch of adhesive is the same for machines produced by four manufacturers, TiteBondMax obtained DATAon the

To test whether the mean time to mix a batch of adhesive is the same for machines produced by four manufacturers, TiteBondMax obtained DATAon the time (minutes) needed to mix the materials. Test whether the machines have equal mean mixing time at = 0.01.

HINT: We state that the evidence against H0 is

  • Extreme when p value < 0.001
  • Overwhelming when 0.001 p value < 0.01
  • Strong when 0.01 p value < 0.05
  • Weak when 0.05 p value < 0.10
  • Insignificant when 0.10 p value
Manufacturer
A B C D
25 23 25 28
23 21 25 27
21 23 25 28
23 24 21 29

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mathematics Questions!