Question: To test whether the mean time to mix a batch of adhesive is the same for machines produced by four manufacturers, TiteBondMax obtained DATAon the
To test whether the mean time to mix a batch of adhesive is the same for machines produced by four manufacturers, TiteBondMax obtained DATAon the time (minutes) needed to mix the materials. Test whether the machines have equal mean mixing time at = 0.01.
HINT: We state that the evidence against H0 is
- Extreme when p value < 0.001
- Overwhelming when 0.001 p value < 0.01
- Strong when 0.01 p value < 0.05
- Weak when 0.05 p value < 0.10
- Insignificant when 0.10 p value
| Manufacturer | |||
| A | B | C | D |
| 25 | 23 | 25 | 28 |
| 23 | 21 | 25 | 27 |
| 21 | 23 | 25 | 28 |
| 23 | 24 | 21 | 29 |
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
