Question: TPG 3 7 0 0 Assignment 1 - 0 2 / 0 4 / 2 0 2 4 1 . 8 The sketch below shows

TPG3700 Assignment 1-02/04/2024
1.8 The sketch below shows design data for a three phase, pre-timed signal of an at-grade intersection. Assume total lost time per phase equals to 3sec, yellow time =3 sec per phase, clearance time =2 sec per phase. Ignore pedestrians. Use Webster's equation to estimate the optimal cycle length. Round up to the nearest 10 and determine green time allocation for each phase.
(11)
[ou naris]
Question 2
2.1 Briefly explain the purpose of directional islands in an at-grade intersection.
2.2 What is the main reason of avoiding at-grade intersections near a horizontal curve or on a crest curve.
2.3 A newly constructed road has been identified to cause unacceptable noise on nearby building. You have been tasked to plan a noise barrier wall. Briefly explain four design aspects you will consider for the barrier design.
2.4 Briefly explain measures you would take to mitigate the effect of erosion for a box culvert that pass beneath the embankment of a rural foad in KZN. Also, explain the implication(s) if erosion is not taken care of tor the road thereof.
3 of 8
TPG 3 7 0 0 Assignment 1 - 0 2 / 0 4 / 2 0 2 4 1

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!