Question: Traditional Philosophy Value Added Time Non-Value- Added Time Total Time Value-added time Within batch wait time Move time Total Value Added Time / Total Time

 Traditional Philosophy Value Added Time Non-Value- Added Time Total Time Value-added

Traditional Philosophy Value Added Time Non-Value- Added Time Total Time Value-added time Within batch wait time Move time Total Value Added Time / Total Time = Value Added Ratio 3.3% Flint Fabricators Inc. machines metal parts for the automotive Lean Manufacturing Philosophy Value Added Non-Value Time Added Time 12 Total Time Value-added time Within batch wait time Move time Total Value Added Time / Total Time = Value Added Ratio 25.0% industry. Under the traditional manufacturing approach, the parts are machined through two processes: milling and finishing. Parts are produced in batch sizes of 30 parts. A part requires 5 minutes in milling and 7 minutes in finishing. The move time between the two operations for a complete batch is 5 minutes. Under the lean philosophy, the part is produced in a cell that includes both the milling and finishing operations. The operating time is unchanged; however, the batch size is reduced to 4 parts and the move time is eliminated. Determine the value-added, non-value-added, and total lead times, and the value-added ratio under the traditional and lean manufacturing methods. If required, round percentages to one decimal place. Flint n1 PNG Traditional Philosophy Value Added Time Non-Value- Added Time Total Time Value-added time Within batch wait time Move time Total Value Added Time / Total Time = Value Added Ratio 3.3% Flint Fabricators Inc. machines metal parts for the automotive Lean Manufacturing Philosophy Value Added Non-Value Time Added Time 12 Total Time Value-added time Within batch wait time Move time Total Value Added Time / Total Time = Value Added Ratio 25.0% industry. Under the traditional manufacturing approach, the parts are machined through two processes: milling and finishing. Parts are produced in batch sizes of 30 parts. A part requires 5 minutes in milling and 7 minutes in finishing. The move time between the two operations for a complete batch is 5 minutes. Under the lean philosophy, the part is produced in a cell that includes both the milling and finishing operations. The operating time is unchanged; however, the batch size is reduced to 4 parts and the move time is eliminated. Determine the value-added, non-value-added, and total lead times, and the value-added ratio under the traditional and lean manufacturing methods. If required, round percentages to one decimal place. Flint n1 PNG

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!