Question: Consider a product mix problem with three products, where we aim to maximize the total profit while satisfying certain constraints. Let's assume the following scenario:

Consider a product mix problem with three products, where we aim to maximize the total profit while satisfying certain constraints. Let's assume the following scenario: Products: Product A Product B Product C Given Data: Product A requires 2 labor hours and 3 units of raw material per unit produced. product B requires 1 labor hour and 2 units of raw material per unit produced. product C requires 3 labor hours and 2 units of raw material per unit produced. There are 100 labor hours and 80 units of raw material available. The profit per unit for Product A is $30 , for Product B is $20 , and for product C is $25 . What is the maximum profit
Step by Step Solution
There are 3 Steps involved in it