Question: Exercise 2-1 Compute a Predetermined Overhead Rate (LO2-1) Harris Fabrics computes its plantwide predetermined overhead rate annually on the basis of direct labor-hours. At the
Exercise 2-1 Compute a Predetermined Overhead Rate (LO2-1) Harris Fabrics computes its plantwide predetermined overhead rate annually on the basis of direct labor-hours. At the beginning of the year, it estimated that 32.000 direct labor-hours would be required for the period's estimated level of production. The company also estimated $544,000 of fixed manufacturing overhead cost for the coming period and variable manufacturing overhead of $4.00 per direct labor-hour. Harris's actual manufacturing overhead cost for the year was $737,750 and its actual total direct labor was 32,500 hours. Required: Compute the company's plantwide predetermined overhead rate for the year. (Round your answer to 2 decimal places.) Predetermined overhead per DLH rate
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
