Question: LINE BALANCING ANALYSIS: A factory with ten production steps operates six days per week for 10 hours/day. A) What is the max allowable workstation cycle

 LINE BALANCING ANALYSIS: A factory with ten production steps operates six

LINE BALANCING ANALYSIS: A factory with ten production steps operates six days per week for 10 hours/day. A) What is the max allowable workstation cycle time in minutes if demand is 90 units per week? B) Group the steps below into the optimal number of workstations. C) What is the efficiency of the balanced line? D) How could we increase the capacity of the line