Question: Module2-2a. The following information is available for our MRP problem. The finished product is 6pk of soft drink. The daily capacity of this operation will

Module2-2a. The following information is available for our MRP problem. The finished product is 6pk of soft drink. The daily capacity of this operation will adequately handle any requirements at this point Each 6 pk(A) is made of one Hi-cone (B), and 6 cans of soda (C). Each can of soda is made of one Closure (D), one Aluminum can (E), and 12 oz soda (F). Please see Chapter 14 slides and practice it. Present inventory on hand is as follows (in millions): The Master Production Schedule (MPS) requirements for 6 pk assembler are as follows (in millions): Periods [day] The 80M structure shows that the operations have 4 loves The gross requirement for A in period 5 is 6 : On hand inventory to A in period 6 is not 0. The gross requirement for B in period 7 is mote than 3 The on hand inventory for C in period 8 is more than -1 The net requirement for D in period 10 is less than 4. The ptanned order release for B in penod 4 is not 5 . The net requirement for E is period 7 is 6 . The gross requirement for F is period 8 is 30 . The planned order recepts for O a period 7 is 0 . Phanned ordet release for Part D in period 5 is not 4 planned order releases for Part C in penod 6 is 18
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
