Question: Two components are made at stations A1 and A2 (one component is made at A1 and the other at A2 ). These components are then
Two components are made at stations A1 and A2 (one component is made at A1 and the other at A2 ). These components are then combined to form a subassembly at station B and moved through the rest of the process, where some additional work is completed at stations C,D, and E. Assume that one and only one person is allowed at each station. The times given below for each station represent the amount of work that needs to be done at each station, with no processing time variation. Assume that inventory is not allowed to build in the system. What is the average hourly output of the process when it is in normal operation? Go to at least three decimals for the intermediate steps (so 12.1786 would be rounded as 12179), and round your final answer up or down to the nearest whole number (so 18.2 would be rounded down to 18 , and 18.5 would be rounded up to 19). Two components are made at stations A1 and A2 (one component is made at A1 and the other at A2 ). These components are then combined to form a subassembly at station B and moved through the rest of the process, where some additional work is completed at stations C,D, and E. Assume that one and only one person is allowed at each station. The times given below for each station represent the amount of work that needs to be done at each station, with no processing time variation. Assume that inventory is not allowed to build in the system. What is the average hourly output of the process when it is in normal operation? Go to at least three decimals for the intermediate steps (so 12.1786 would be rounded as 12179), and round your final answer up or down to the nearest whole number (so 18.2 would be rounded down to 18 , and 18.5 would be rounded up to 19)
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
