Question: Two designs have been proposed for a short - span bridge in a rural area, as shown in the following table. The first proposal is
Two designs have been proposed for a shortspan bridge in a rural area, as shown in the following table. The first proposal is to construct th bridge in two phases Phase I now and Phase II in years The second alternative is to construct it in one phase.
Assuming that the annual interest rate is percent, use present worth analysis to calculate the present worth in dollars for each alternativ Assume all maintenance costs are due at the end of each year.
Alternative mathrmAquad mathrmPW$
Alternative mathrmBquad mathrmPW$
Determine which alternative is preferred.