Question: Two designs have been proposed for a short - span bridge in a rural area, as shown in the following table. The first proposal is

Two designs have been proposed for a short-span bridge in a rural area, as shown in the following table. The first proposal is to construct th bridge in two phases (Phase I now and Phase II in 25 years). The second alternative is to construct it in one phase.
Assuming that the annual interest rate is 4 percent, use present worth analysis to calculate the present worth (in dollars) for each alternativ (Assume all maintenance costs are due at the end of each year.)
Alternative \(\mathrm{A}\quad \mathrm{PW}=\$ \)
Alternative \(\mathrm{B}\quad \mathrm{PW}=\$ \)
Determine which alternative is preferred.
Alternative A
Alternative B
Two designs have been proposed for a short - span

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!