Question: Two network operation centres are located 3 2 km apart, based on the duct route between them. The primary communication devices at each centre are
Two network operation centres are located km apart, based on the duct route
between them. The primary communication devices at each centre are wide area
network capable routers with fibre optic communication link modules, and the centres
are connected by external single mode um fibre optic cable which has three
external joints. The total internal distance from the external cable change over splice
in the building to the routers is m and a mated connector is required to make the
termination at each router. It is necessary to include an additional loss margin of dBs
to account for component ageing and future cable repairs.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock