Question: Two traffic signal systems are being considered for an intersection. One system costs $33,000 for installation and has an efficiency rating of 81%, requires 26

Two traffic signal systems are being considered for an intersection. One system costs $33,000 for installation and has an efficiency rating of 81%, requires 26 kW power (output), incurs a user cost of $0.24 per vehicle, and has a life of 10 years. A second system costs $43,000 to install, has an efficiency rating of 92%, requires 36 kW power (output), has a user cost of $0.21 per vehicle, and has a life of 18 years. Annual maintenance costs are $75 and $110, respectively. MARR=8% per year. How many vehicles must use the intersection to justify the second system when electricity costs $0.07/kWh? Assume salvage value for each system equals zero. Project the difference in the user cost as savings for the second system. There are approximately 8,760 hours/year. At least how many vehicles per day must use the intersection to justify the second system? (Round up to the nearest whole number.)Two traffic signal systems are being considered for an intersection. One system

| 1 10-6240 0261 51 9 7 6 4 4 3 2 2 110 1000000000000000000 95|3101 0 0261 3222 0-0 0 0 0 OG -1 0 0 0 0-0 0 0 0 0-0 0 0 0 0-0 0 0 0 25-469 5-527 FvP_9 7 5 3 9 6 2 7 2 715925813 3 0123345566-7 7 7 888999 2 8 0258-39 1234578 644 024 6 8 1 47-0371 2532 0300 9327 1001 3 nFS in er : 2 59383 766 2 8 4 43 0G |0 0 0 0 000000000000000 753-9 909-6 2 31-37-2 FVF-0 1 2 3 4 5 7 8 9 1357914793 N1 2 3 4 5 6 7 8 9 0123456789 11

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!