Question: (Type 2: 5 points) Below is the data in the usual notations about 5 jobs (A through E); find the value of X in the
(Type 2: 5 points) Below is the data in the usual notations about 5 jobs (A through E); find the value of X in the table below using the SPT rule.
| Jobs | PT | DD | Jobs | PT | DD | CT=FT | Late | |
| A | 4 | 10 |
|
|
|
|
| |
| B | 6 | 14 |
|
|
|
|
| |
| C | 3 | 2 |
|
|
|
|
| |
| D | 2 | 6 |
|
|
|
|
| |
| E | 5 | 16 |
|
|
|
|
| |
| Sum |
|
|
|
| ||||
| F-Bar | X |
|
|
| ||||
| ANJ |
|
|
|
| ||||
| L-Bar |
|
|
|
|