Question: undefined Figure 1.1 shows a project Work-Breakdown-Structure (WBS) for installing new computer system with cost apportioned by percents from each deliverables. Assuming the estimated total

undefined Figure 1.1 shows a projectundefined

Figure 1.1 shows a project Work-Breakdown-Structure (WBS) for installing new computer system with cost apportioned by percents from each deliverables. Assuming the estimated total project cost is RM250,000. Installation for new system 1 RM250,000 Equipment installation System development 1.2 35% Final debugging 1.3 20% Position recruiting 1.4 25% 20% Equipment testing and modification 1.1.1 100% Manual testing 1.2.1 30% System training 1.2.2 40% System testing 1.2.3 30% Job training 1.4.1 60% Orientation 1.4.2 40% System changeover 1.2.3.1 100% Figure 1.1: Work-Breakdown-Structure (WBS) for installing new computer system a. Calculate the estimated costs for the following deliverable or subdeliverable: i. Equipment installation ii. System changeover iii. Orientation

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!