Question: Under the three-variance method for analyzing factory overhead, the difference between the actual factory overhead and the budget allowance based on actual input is the
Under the three-variance method for analyzing factory overhead, the difference between the actual factory overhead and the budget allowance based on actual input is the
| A. | Efficiency variance. | |
| B. | Spending variance.
| |
| C. | Volume variance.
| |
| D. | capacity varianceIdle
|