Question: Unit 9 : Architectural Drawings Activity 9 - 2 : Plan Drawings for a Commercial Building Project Refer to Sheets A 0 . 1 ,

Unit 9: Architectural Drawings
Activity 9-2: Plan Drawings for a Commercial Building Project
Refer to Sheets A0.1, A1.1, A1.2, A1.3, A2.1, and A3.1 from the Delhi Flower and Garden Centers commercial building plans in the Large Prints supplement to answer the following questions.
1. What sheet are the supplemental notes on?
Answer: A0.1
2. What typical size are the metal studs to be for interior walls unless noted differently on the drawings? What spacing is to be used?
Answer: 16 center 3-5/820 stud
3. Wood that is in contact with concrete should be what type?
Answer: pressure treated wood
4. What is the cabinet contractor to do prior to construction?
Answer: The cabinet contractor is to submit shop drawings prior to construction for approval
5. What scale is the first floor plan?
Answer: 1/8=1-0
6. What is the overall size of the loading/shipping area?
Answer: 4810 by 29-2
7. What do the diagonal lines in the walls indicate?
Answer: CMU wall
8. Identify the flooring material in the following locations:
A. Check-out area
Answer: unfinished concrete
B. Greenhouse sales
Answer: interlocking pavers
C. Covered sales
Answer: unfinished concrete
D. Mens and womens restrooms
Answer: ceramic tile
9. What kind of glass is used in the count room?
Answer: one way glass
10. Where is the roof access hatch located? What detail provides additional information?
Answer: between M1-21.2 Detail 8
11. What details provide additional information for the paver floors?
Answer: Outside sales area pavement
12. Referring to Question 11, what is the difference between the greenhouse sales floor and the outside sales floor?
Answer: 3 limestone
13. Answer the following questions about the planters at the covered entry.
A. What detail is referenced?
Answer: entry elevation
B. How thick is the concrete wall?
Answer: 32
C. What is to be added to the concrete wall inside of the planter?
Answer:
D. What is to be installed over the concrete wall outside of the planter?
Answer:
E. How high is the wall above the paver floor?
Answer:
14. What type of structure is above the checkout counters? What detail is referenced?
Answer:
15. Which way is Plan North facing, to the right or left side of the drawings?
Answer:
16. Where are the stairs to the mezzanine located?
Answer:
17. What is the riser and tread information for the stairs to the mezzanine?
Answer:
18. What sheet is the roof plan on?
Answer:
19. What is the slope of the rafter framing above the gate into the outside sales area?
Answer:
20. What type of roof is used above the covered entry?
Answer:
21. What is to be done to the bar joists in the hardlines room?
Answer:
22. What is the symbol for ceiling fans? Draw the symbol freehand.
Answer:
23. Where are the compact fluorescent recessed can fixtures located?
Answer:
24. What supplemental notes refer to the roofing system?
Answer:
25. Match the building components and materials indicated by the symbols and detail drawing below to the correct terms in the list. Answers are used only once. Some letters are not used. Write your answers in the spaces provided.
A. Cultured stone facing
B. Limestone screenings
C. Drywall partition
D. Concrete
E. Rebar
F. Welded wire fabric
G. Concrete pavers
H. Gravel or limestone subbase
I. Subsoil
J. Masonry wall
1. Answer:
2. Answer:
3. Answer:
4. Answer:
5. Answer:
6. Answer:
7. Answer:

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!