Question: Unit Cost Estimation An industrial project uses CSI 3 3 4 1 1 3 . 4 0 . 1 , 0 0 0 L .
Unit Cost Estimation
An industrial project uses CSI LF of inch diameter gauge corrugated metal pipe and LF of inch diameter gauge corrugated metal pipe need to be installed. You are a subcontractor supplying the contractor with a crew of B and need to develop a detailed estimate for the bid that will be submitted in days.
a Duration crew days for inch pipe:
b Duration crew days for inch pipe:
c Duration labor hours for inch pipe:
d Duration labor hours for inch pipe:
e Unit cost $ for inch pipe:
f Unit cost $ for inch pipe:
g Total cost of the project $:
Storm Utility Drainage Piping Public Storm Utility Drainage Piping
tableCrea BJHeDaily,Daily,tableBareCoststableIndOsptable$