Question: Unit Cost Estimation An industrial project uses CSI 3 3 4 1 1 3 . 4 0 . 1 , 0 0 0 L .

Unit Cost Estimation
An industrial project uses CSI 334113.40.1,000 L.F. of 18-inch diameter 16 gauge corrugated metal pipe and 500 L.F. of 24-inch diameter 14 gauge corrugated metal pipe need to be installed. You are a subcontractor supplying the contractor with a crew of B-14 and need to develop a detailed estimate for the bid that will be submitted in 5 days.
a) Duration (crew days) for 18 inch pipe:
b) Duration (crew days) for 24 inch pipe:
c) Duration (labor hours) for 18 inch pipe:
d) Duration (labor hours) for 24 inch pipe:
e) Unit cost ($) for 18 inch pipe:
f) Unit cost ($) for 24 inch pipe:
g) Total cost of the project ($):
3341 Storm Utility Drainage Piping 334113- Public Storm Utility Drainage Piping
\table[[Crea B.13J,He.,Daily,Hr,Daily,\table[[Bare],[Costs]],\table[[Ind],[Osp]]],[,\table[[$33.10
Unit Cost Estimation An industrial project uses

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!