Question: UNIT HYDROGRAPH QUESTION. A storm drain is being designed for an urban catchment of A = 5 k m 2 . The design requirement is

UNIT HYDROGRAPH QUESTION.
A storm drain is being designed for an urban catchment of A=5km2. The design requirement is the 5% AEP flood.
Continuous records are unavailable at this location. However, data from a single event was analysed to develop a unit hydrograph for this catchment. The ordinates of this UH are shown in the table below and graph.
The design requires the 36minI20 design rainfall which is 80 mm/hr. The areal reduction factor for this location, catchment size, duration and AEP is 0.95.
The temporal pattern to be simulated is 10% of rainfall in the first 9-minute period, 30% of rainfall in the second 9-minute period, 40% of rainfall in the third 9-minute period, and 20% of rainfall in the fourth 9-minute period.
Rainfall loss for this location can be neglected (ie, assume incident rainfall = effective rainfall).
Using the information, obtain the direct runoff hydrograph at this location for the abovementioned rainfall pattern.
UNIT HYDROGRAPH QUESTION. A storm drain is being

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!