Question: URGENT HELP NEEDED WITH THIS PRACTICE QUESTION - PLEASE ASSIST WITH THIS PRACTICE QUESTION. PRACTICE QUESTION 8- The Engineering Solutions Company Limited (ESCL) has tendered

URGENT HELP NEEDED WITH THIS PRACTICE QUESTION - PLEASE ASSIST WITH THIS PRACTICE QUESTION.

URGENT HELP NEEDED WITH THIS PRACTICE QUESTION -

URGENT HELP NEEDED WITH THIS PRACTICE QUESTION -

PRACTICE QUESTION 8- The Engineering Solutions Company Limited (ESCL) has tendered for, and won a contract to design and build a computerized flood-warning system in Trinidad and Tobago. Consider the activities, durations, and predecessor relationships to roll out this project, in the following network, shown in Table 7 below. Draw the network and answer the questions that follow. Table 7. ESCL Computerized Flood-Waming System Project Activity Description Immediate Predecessor(s) Optimistic (Weeks) 2 Time Most Likely (Weeks) Pessimistic (Weeks) 4 B 1 4 7 A 2 2 2 D B 1 7 10 E D 2 4 6 F E 1 2 3 G 3 4 17 H D G 3 7 11 I D 8 9 10 J F, H 4 5 5 6 K I 1 1 1 a) Using a network, what is the earliest expected time of completion of the whole project and Identify the Critical Path or Paths in this project. b) Using the information from Table 7. what is the probability that the project can be completed in 28 days? c) Using the information from Table 7. if the project manager wants at least a 98% probability that the project will be completed on or before the due date, what is the shortest project due date that will satisfy the project manager

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!