Question: Use ARENA Simulation Softwate to solve question. Question:In this project we will build a simulation model for an airport.Our airport works 24 hours per day

Use ARENA Simulation Softwate to solve question.

Question:In this project we will build a simulation model for an airport.Our airport works 24 hours per day and we will run our model for 10 days.Passengers arrive at the main entrance door of the airport with an exponential distribution with mean 2.1 minutes, with the first arrival at time 0.After coming to entrance door, passengersgo to the entrance security first,and travel time from entrance to security is distributed uniformly between 1.2 and 2.3 minutes.There are 3entrance security, fed by a single FIFO queue. Also, passengers pass through security withtriangular distribution with parameters 3.4, 4.8, 5.2. Of these passengers, 35% go leftto an old-fashioned manual check-in desk, 50% go right to a newfangled automated check-in desk, and the remaining 15% dont need to check in at all and proceed directly to the final security.Travel time between entrance security and manual check-in desk is distributed uniformly between 1.2 and 2.4 minutes. Travel time between entrance security and newfangled automated check-in desk is distributed uniformly between 1.5 and 2.3 minutes. Travel time between entrance security and the final security is distributed uniformly between 2.9 and 3.3 minutes.In the first 12 hours, there are 3agents at the manual check-in stationand in the second 12 hours there are 2 agents at the manual check-in station, fed by a single FIFO queue; manual check-in times follow a triangular distribution with parameters minimum 2.3, mode 5.5and maximum 8.4minutes. After manual check-instation, passengers walk to the final security area, travel time between manual check-in stationand the final security area takes between 2.0 and 5.8 minutes, uniformly distributed. The automated check-in has two kiosk machines, fed by a single FIFO queue, and check-in times are triangularly distributed with minimum2.1, mode 3.6and maximum 5.2minutes. These kiosk machine can be broken down some time. Kiosk machines are up for exponential distribution with mean 30 minutes and their repairing time is exponential distribution with mean 10 minutes (if kiosk machine is busy, it finishes its job and then it is broken down; on the other hand repairing time willbe expo(10) minutes regardless of the additional processing time). After automated check-in, passengers walk to the final security area, taking between 1 and 3 minutes, uniformly distributed, to get there. All passengers eventually get to the final security area, where there are six stations fed by a single FIFO queue. In the final security, there are different processing times available. Final security-check times are triangular distribution with minimum 1, mode 2 and maximum 6 for the passengers that pass through manual check in desk.Final security-check times are triangular distribution with minimum 1.3, mode 2.5 and maximum 5.8 for the passengers that pass through

2automated check-in desk. Finally, final security-check times are triangular distribution with minimum2.2, mode 2.8 and maximum 6.1 minutes for the passengers that go to final security directly(these timescaptures all the possibilities there, like x-ray of carry-ons, walking through the metal detector, bag search, body wanding, shoes off, laptop checking, etc.). Once through the final security check, passengers head to their gates and travel time between these two take uniform distribution between3.5and 4.2 minutes. After coming to gates, passengers leaves the airport.Simulate this system for one replication of24 hours per day and for 10 days. Put in plots that track the length of each queues of entrance security and final security.Run the simulation model and collect these statistics:Collect statistics for queue length, queue time and utilization of the resourcesHow many passengers leave airport?Calculate the time interval between two security points, calculate time interval BEFOREentrance security and AFTERfinal security point.Which process or processes would you consider as bottleneck(s)of this system, why? Support your answer by using the simulationreport.You are required to:i)Explainthestepsyoufollowedwhenyoubuildthemodel(youcanusescreenshots).ii)Comment on each of the statistics given above. Submit your simulation report, your comments and your answers in a single document via itslearning.iii)Submit your .doefile,.outfileof your modeland your reportwith your commentsand to do so please useitslearning.If you will not submit your report, you can get maximum 50points. Similarly, if you will not submit your arena model (.doe file)you can get maximum 50points.Reminder: Notice that, this task requires individual work. Your work should beyours and unique. No cheating or you will get a 0 (zero). In addition, no late submission or you will get 0(zero).Grading policy for project: Arena implementation & report: 60%, comments & inferences: 30%, document organization: 10% (clear, neat and well organized report)Hint 1: If there is a walking timeor travel timebetween any two modules,use ROUTE and STATION modules. Otherwise, you will NOTget points from thislogic.Hint 2: Be careful about the capacities of the resources!Hint 3: Kiosk machine can be broken down in our system. Check Model 4-2 in Week 7 for handling this situation. Also, you need to decide the failure rule with the information given in the text.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!