Question: Use flexsim to generate a simulation with 1 machine. The output location is 1 2 0 feet away from the machines. The input location is

Use flexsim to generate a simulation with 1 machine. The output location is 120 feet away from the machines. The input location is 200 feet away. Jobs arrive at the rate of 1 every 5 minutes. The processing time on machines is 4 minutes for each machine with an exponential distribution. You have AGV to move jobs. AGV load and unload in 20 seconds. The speed of AGV is 2 ft per second. How many AGVs do you need. Solve with and without simulation.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!