Question: Use QM for Windows to help explain and solve. SPRING GARDEN TOOLS The steel the company uses is ordered from an iron and steel works

Use QM for Windows to help explain and solve.

Use QM for Windows to help explain and solve.

SPRING GARDEN TOOLS The steel the company uses is ordered from an iron and steel works in Japan. The company has 10,000 square feet of sheet steel available each month. The metal required for each tool and the monthly contracted pro- duction volume per tool are provided in the following table: Sheet Metal (ft.) Monthly Contracted Sales The Spring family has owned and operated a garden tool and implements manufacturing company since 1952. The company sells garden tools to distributors and also directly to hardware stores and home improvement discount chains The Spring Company's four most popular small garden tools are a trowel, a hoe, a rake, and a shovel. Each of these tools is made from durable steel and has a wooden handle. The Spring family prides itself on its high-quality tools. The manufacturing process encompasses two stages. The first stage includes two operations-stamping out the metal tool heads and drilling screw holes in them. The completed tool heads then flow to the second stage, which includes an assembly operation where the handles are attached to the tool heads, a finishing step, and packaging. The processing times per tool for each operation are provided in the following table: 1.2 1.6 Trowel Hoe Rake Shovel 1.800 1,400 1.600 1.800 Total Hours Available per Month Tool (hr./unit) Operation Trowel Hoe Rake Shovel Stamping 0.04 0.17 0.06 0.12 Drilling 0.05 0.14 - 0.14 Assembly 0.06 0.13 0.05 0.10 Finishing 0.05 0.21 0.02 0.10 Packaging 0.03 0.15 0.04 0.15 The primary reasons the company has survived and prospered are its ability always to meet customer demand on time and its high quality. As a result, the Spring Com- pany will produce on an overtime basis to meet its sales requirements, and it also has a long-standing arrangement with a local tool and die company to manufacture its tool heads. The Spring Company feels comfortable subcontract- ing the first stage operations because it is easier to detect defects prior to assembly and finishing. For the same rea- son, the company will not subcontract for the entire tool because defects would be particularly hard to detect after the tool was finished and packaged. However, the company does have 100 hours of overtime available each month for each operation in both stages. The regular production and 500 400 600 550 500 overtime costs per tool for both stages are provided in the following table: Stage 1 Regular Overtime Cost Cost $6.00 $6.20 10.00 10.70 8.00 8.50 10.00 10.70 The cost of subcontracting in stage 1 adds 20% to the regular production cost. The Spring Company wants to establish a produc- tion schedule for regular and overtime production in each stage and for the number of tool heads subcontracted, at the minimum cost. Formulate a linear programming model for this problem, and solve the model using the computer. Which resources appear to be most critical in the produc- tion process? Stage 2 Regular Overtime Cost Cost $3.00 $3.10 5.00 4.00 4.30 5.00 5.40 Trowel Hoe Rake Shovel 5.40

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!