Question: User 1 owns three processes (A through C) and User 2 owns two processes (D and E). Which of the following scheduling can reach the
User 1 owns three processes (A through C) and User 2 owns two processes (D and E).
Which of the following scheduling can reach the fair-share that User 1 is assigned 40% of the CPU and User 2 is assigned 60% of the CPU?
1. E A B D C E A B D C E A B D C
2. A B C D E A B C D E A B C D E
3. D E A B C D E A B C D E A B C
4. A D B E C D A E B D C E A D B
5. A A D E E B B E D D C C D E E
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
