Question: using arena Test Content An assembly production system is composed from 2 stations in series, Parts arrive according to expo(5) minutes. First part arrives at

using arena
using arena Test Content An assembly production
using arena Test Content An assembly production
using arena Test Content An assembly production
using arena Test Content An assembly production
using arena Test Content An assembly production
Test Content An assembly production system is composed from 2 stations in series, Parts arrive according to expo(5) minutes. First part arrives at time zero. Parts first arrive station 1, it has one worker the processing time is uniform from 2 to 3.5 minutes. Then parts move to a second station, the station has two workers working in parallel each needs expo{8.5) minutes to assemble each product Finished products leave the system Run the simulation once for 12 hours. Select the correct answers only: Question 1 1.25 Points The throughput is about 116 products assembled over in 12 hours or 9.66 product/hr A True B False Question 2 1.25 Points The Maximum Work in Process (WIP) is equal to: A6 or less 8 9 or more Question 3 1.25 Points The utilization of worker 1 is about: 15% 19% 25% D44% Question 4 1.25 Points The system time for a given product in this model is about 14.8 minutes True False Question 5 1.25 Points The average Work In Process (WIP) is about 1.2 product B 16 product 2.1 product 2.4 product Question 6 1.25 Points Using ARENA you can plot the "Average Total time as a function of the simulation time True False Question 7 1.25 Points The average utilization of workers on station 2 is about 68% True False Question 8 1.25 Points We need to use "DECIDE" Module for modelling this problem. True B False

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!