Question: Using Brown Engeneering Group as an example for a project like new plant/equipment Boiler installation. Formulate a detailed Work Breakdown Structure and come with feasible

Using Brown Engeneering Group as an example for a project like new plant/equipment Boiler installation. Formulate a detailed Work Breakdown Structure and come with feasible duration for each activity. Produce a table of activity, duration and predecessors, the most likely duration etc. for PERT table formulation. Using the table produce a network of activities and determine the critical path. Include in your work the ED, LC, EF, etc. [100 marks] INSTRUCTIONS: Include in text citations and reference page