Question: Using Johnson's rule for 2-machine scheduling, the sequences Scheduled Order Job Six jobs are to be processed through a two-step operation. The first operation involves

Using Johnson's rule for 2-machine scheduling,
Using Johnson's rule for 2-machine scheduling, the sequences Scheduled Order Job Six jobs are to be processed through a two-step operation. The first operation involves sanding and The second involves painting Processing times are as follows: 2 Job Operation 1 (hours) 1 10 8 11 4 2 Operation 2 (hours) 3 12 7 3 4 D E F 5 6 13 6